
Samui Service Co., Ltd. is a registered Thai company
with German management. We are in business since 2007.
We have built up an international knowledge team to
provide smart, cost saving and low energy solutions
for private residences, hotels/resorts and industry.
|
We consult all about energy.
We provide, install and maintain
- Solar Systems
- Air conditioners with "hot water for free"
- Heat Pumps for residential and commercial purposes
- Solar Water Heater
- Solar powered DC pumps
- Backup systems
everywhere in Thailand. |
 |
Together with our partners
we also consult about
- Water purification systems
- Waste water treatment
- Low Energy LED lighting
- Building insulation and ventilation
For Koh Samui and South
Thailand we have two teams who can do all kind of electrical
and piping jobs.
For jobs around Bangkok,
North or East Thailand we rely on the teams from our
local partners all over the country.
Warranty, after sales
service is guaranteed!
To contact us, please
go to the contact sheet or:
- Visit our office at the ringroad opposite MAKRO in
Bophut
- Call us at +0066: (0)83-175 8861, (0)82-286 6438,
(0)77-430 611
- email solarpower(@]samui-service.com
- ... and here a skype contact: claude_feller |


|
__________________________________________________________________________________________
__________________________________________________________________________________________
02. January
2010
NEW LOW ENERGY PRODUCTS
In our effort
to provide low energy products we can now supply our customers
with
- dish washers
with both cold and hot water inlet
- washing machines with both cold and hot water inlet
What is the advantage?
Both types of household devices are using 75 % of their energy
consumption to heat water by an electric heater - the standard
is only one water inlet for cold water. With a separate hot
water inlet we can use hot water from A/C systems, from a
solar water heater or from a heat pump to save energy. Our
supplier is one of the biggest manufacteur worldwide, we guarantee
the highest quality standard. The price is almost the same
like what you can see at your local HomePro!
Be smart, think
green and save money!
__________________________________________________________________________________________
14. December
2009
AIR CONDITIONERS AND HOT WATER
The
first installation jobs with Air conditioning and Hot Water
have been completed succesfully:

For these newly renovated bungalows
we have installed the hot water tanks where the water is getting
heated directly by the refrigerant pipe. We use stainless
steel tanks and heat exchangers, no risk of corrosion - these
systems are running fine since ten years!

Retroffiting of the waste heat recovery system:
The heat exchanger is behind the compressor, the warm water
is transfered to the tank by PPR pipes. Besides of the storage
tank this system needs a circulation pump and magnetic relays:
___________________________________________________________________________________________
31. October 2009
TESTING WASTE HEAT RECOVERY
Our new branch is getting cooled
by an 24,000 BTU air conditioner with waste heat recovery:
The thermal heat in the refrigerant gas - normally blown out
by the compressor fan - is transfered to a water filled circulation
pipe which is connected to a hot water storage tank. For several
days we have monitored both the energy consumption of the
A/C and the hot water generation:
- It takes 6 hours to heat up 300
liters water from 31°C to 45°C, this is enough for
10 warm showers and it is equal to 5 kWh
- In average the A/C is consumpting 1,6 kW per hour, hence
almost 10 kWh in these 6 hours
- This means that 50 % of the electrical energy to run the
A/C is normally wasted - blown in the air by the compressor
fan.
- The yearly costs saving by running 6 hours is more than
6,000 THB - not regarding the saved investment for several
electric water heaters.
Regarding your electricity bill:
The standard hotel business is charged also according to the
maximum demand in 15 minutes, see here,
page 6.
This "demand charge" means for example:
- For 10 electric heaters each 5 kW running at the same time
for 15 minutes the "demand charge" on your bill
will be 10,000 THB per month higher! Avoid electric heaters
but use your air conditioner to provide hot water.
Be smart, be green and save money!
___________________________________________________________________________________________
02.
October 2009
OPENING A NEW BRANCH
Samui Service Ltd. is opening a
new branch in Koh Samui, located in a busy area opposite Macro
in Bophut.
We are now extending our product line and we will promote
> Air conditioner that can provide hot water for free
> All types of low energy heat pumps for commercial and
residential purposes
> LED Lighting for shops and high end Villas.
While many projects in Samui are getting
canceled due to financial crisis: Samui Service is investing,
we believe in Solar Energy and in smart Low Energy devices.
For all cooling / heating related
questions we rely on our partner "Promjak Air Service
Gold Co., Ltd. (PAC)"
with whom we already accomplished some succesfull projects
all over Thailand.
___________________________________________________________________________________________
18. July 2009
THE LARGEST PRIVATE SOLAR INSTALLATION
IN THAILAND
After coordinating three specialised teams
and up to 12 staff members, after installing 250 m² of
solar panels,
8 tons of batteries and more than 2 km of cables:
The largest private solar installation in Thailand is providing
80 kWh of 3-phase energy and 20 m³ of fresh water per
day.
Beside of this we have supervised the whole water feder system,
assisted to establish a smart irrigation system and finally
low energy intelligent pool pumps and a modern water purification
system.
Everything is working fine but of course they are still some
problems or concerns about the established new technologies,
hence we now focus to the "after sale service",
means we are still on site every week for training (and learning!)
purposes
and to check which parts of the systems might better be upgrated.
A very exciting project is becoming succesfull and it will
be our showroom for similar scopes.
Here some impressions, please click the pics to enlarge.
|
|
|
The project
has the size of an hotel with different buildings |
Located on the
beach without road access! |
Coordination
is a basic duty
but not easy in Thailand. |
|
|
|
Voilà
126 solar panels |
Rough conditions
close to the sea - hot and dangerous |
The SMA inverters
are creating a pure 3-phases AC grid. |
|
|
|
Six Sunny Islands
on the way to their destination. |
We control the
performance by the grey colored webbox. |
We have designed
and installed some very special features. |
|
|
|
Setup of 8 tons
of batteries providing.. |
... total 200
kWh energy. Enough for 3 days supply. |
The small diesel
backup will start automaticly on very high load. |
|
|
|
The solar tracker
is supplying 4 DC solar pumps |
Installation
jobs can be wet and funny. |
We will now monitor
the water supply and demand - to learn more. |
|
|
|
The 250 m³
pool would normally use of 60 kWh pump energy |
Our smart pumps
can reduce this to only 20 kWh per day! |
Where to buy
or order the specific device? Difficult every day! |
|
|
|
Drinking water
by an UV lamp with filtration |
Low energy solar
fridge and freezer - saving up to 70 % |
My teams: Keen
to learn, carefully and always in good mood! |
| This high-end Villa will be promoted all over
Asia as a top holiday residence with a focus on "eco
friendly" - not in a "hippy sense" but
in merging renewable energy with smart low energy devices.
The gain in marketing branding and originality of this
destination will be huge. Depending on the occupancy rate
we estimate to cover 80-90 % of the energy need by solar
power. Please contact for more info or for a visit on
site. |
___________________________________________________________________________________________
13. May 2009
SOLAR INSTALLATIONS ARE PROGRESSING
The whole May is dedicated to our ambitious
Solar installations in Phuket. Here the actual progress with
- Solar roof installation 20 kWp
- Solar Tracker with 2 kWp
Click on the pics to enlarge.
___________________________________________________________________________________________
03. March 2009
REVERSE OSMISIS SYSTEM
Together with our close partner
Ourworld Ltd. from Vientiane/Laos we now offer RO systems
for water desalination.
Where no grid is available our small DC systems (starting
at 32 liter per hour) can run on solar power.
For a large need of potable water we have AC systems able
to desalinate up to 30 cbm per day.
Please contact for more info and a pricelist.
___________________________________________________________________________________________
20. February 2009
AIR-TO-WATER HEAT PUMP WATER HEATER

This is definetly an cost
effective alternative to solar water heaters,
especially if the property will not be occupied every day
of the year.
Low energy consumption and the cooling capacity makes it a
"green product".
___________________________________________________________________________________________
10. February 2009
SOLAR LAUNDRY HEATER
|
Twelve
heat pipe collectors and one 1000 liters Solar tank
will help the Anantara Golden Triangle to reduce the
extremly high gas costs at the laundry section.
Definetly a useful application for Solar because the
thermal energy is produced "on demand" means
from 8 am to 5 pm when the large laundry machines are
running.
Considering that the Anatara is located some 1,600 km
away from Samui and that we had to ship a lot of equipment
for this large installation we are pretty proud that
we could complete this demanding job in a succesfull
way. Thanks to the Anantara team for their support! |
__________________________________________________________________________________________
21. January 2009
SOLAR ENERGY
We are the exclusive contractor
for the largest private solar project in South East Asia.
We have designed and we will install a 20 kWp state of the
art solar system to power a large Villa and the affiliated
buildings.
Beside of generating 80 kWh pure 380 V AC solar energy per
day we will install a solar powered DC system to supply the
Villa
and the landscape with sufficient well water.
Furthermore we have revised both lighting and water distribution
plannings to find more cost and energy saving solutions.
Our partners for this exciting project:
Technical consulting and hardware supply: Sunlabob
Ltd. from Vientiane/Laos
All water related questions: Ourworld
Ltd. from Vientiane/Laos
Both are German managed.
Project management: Espaceconcept
from Bali (French)
___________________________________________________________________________________________
More news
2008 and 2007
|